Over the weekend I made it up to the half-way point on the wall, with some heavy lifting help from my brother Saturday. That’s about 265 blocks placed and 560’ of rebar tied and weaved vertically and horizontally through them. Working with the rebar proved to be very hard on work clothes and skin. Numerous rips and tears in clothes, arms and legs. O and then there was a little fire incident Friday night while cutting rebar with a 4” angle grinder. If all the sparks are concentrated in to one area of the clothing it will catch fire. The pictures are all starting to look the same for the most part just more block on the walls and less on the pallets in the middle.
Monday, June 18, 2012
Walls are half way up!